Telangana’s Chief Minister layed the foundation stone of old city metro line
Telangana’s Chief Minister layed the foundation stone of 5.5 km old city metro rail project,which will have four elevated stations between M.G. Bus Station (MGBS) and Falaknuma.Originally intended to be a 15 km stretch of the Green Line (JBS – MGBS – Falaknuma) of the 72 km Hyderabad Metro Phase 1 project, this elevated metro line was never built.The line is now scheduled to be constructed as part of the 70 kilometre Hyderabad Metro Phase 2 project, with plans to eventually extend it to Chandrayangutta X Road.
0