Written by KP Construction

Godavari Gammon Bridge Under Repair

There has been damage to the Gammon Bridge across the Godavari River Connecting Kovvuru with Diwancheruvu. Regarding the safety of the bridge. Until the flaw is fixed, the authorities will control traffic on the bridge. Principal secretary for roads and buildings Pradhyumna paid a visit to the location on Monday night, accompanied by East Godavari collector Madhavi Latha, SP Jagadish, R&B chief engineer, MD of the State Highways Development Corporation Srinivas Reddy, and sub-collector Ashuthosh Srivatsav. According to Pradyumna, the officials saw the bearing damage between the 56th and 57th span. To guarantee safety, quick action would be taken. Pradyumna stated that the issue will be resolved in four or five days if the bearing was easily obtained. If not, the bearing would be constructed in accordance with the bridge’s standards. According to Collector Madhavi, vehicles are only permitted to travel in one direction at a time till the damage is fixed.

0